The Keel method

Ship every week. Meet less. Write it down once.

Keel is built around a rhythm we have watched work in 1,900 teams: small issues, two-week cycles, one triage shift a day and a Friday update nobody has to write. Take the parts you like.

Six principles

  1. METHOD-1 Adopted

    Small issues ship. Big issues wait.

    If an issue will take more than three days, it is a project with sub-issues. Two-day issues finish inside a cycle; two-week issues roll over until somebody splits them.

  2. METHOD-2 Adopted

    Plan from capacity, not from hope.

    A cycle holds what the team finished in its last three cycles, give or take 10%. Keel fills it by priority and stops. The rest waits, visibly.

  3. METHOD-3 Adopted

    Every report gets an owner the same day.

    One person per team takes the triage shift each morning. Reports are accepted, merged or declined before lunch. Nothing sits in a shared inbox.

  4. METHOD-4 Adopted

    Status comes from the work.

    Branches move issues, merges close them, projects measure themselves. If you are asking someone for a status, a tool is not doing its job.

  5. METHOD-5 Adopted

    Write it down once, where the work is.

    Decisions go in the issue, not a chat thread. The Friday update is drafted from the week’s issues, so the history is already written.

  6. METHOD-6 Adopted

    Rest on purpose.

    After six cycles, a cooldown week with nothing planned. Fix the papercuts, explore, delete the backlog you will never do.

A week with Keel

Fifty minutes of meetings. The rest is work.

Click through a real week of the Halyard team. What the team does is short; what Keel does without being asked is the long list.

Monday · Cycle 25, week 1

The cycle opens itself

Leads glance at the plan over coffee and swap an issue or two. That is the planning.

Meeting time this week, so far10 min

before Keel: 4 h 15 min a week, per lead

Meetings teams closed

Filed, done, not missed.

What teams tell us they stopped doing in their first two months, and what replaced each one.

0 min

of meetings back every week, per lead

  • Monday planning

    MTG-1 · was 90 min, whole team

    replaced by Capacity-based cycles that fill themselves

    AM
  • Mid-cycle check-in

    MTG-2 · was 45 min, leads

    replaced by The burn-up and its projection

    SP
  • Thursday status sync

    MTG-3 · was 60 min, 12 leads

    replaced by Health measured from the work

    RD
  • Bug triage meeting

    MTG-4 · was 30 min, twice a week

    replaced by A 20-minute triage shift, one person

    JK
Rules of thumb

The numbers we would start with.

Defaults, not law. Every one is a setting in Keel, per team.

cycle length
2 weeks
Long enough to finish something real, short enough that a bad plan costs little.
per issue
≤ 3 days
Anything bigger becomes a project with sub-issues.
issues in progress per person
2
Finishing beats starting. Keel shows a soft warning at three.
from report to owner
1 day
The triage shift rotates daily; nothing waits for a meeting.
cycles is a cooldown
1 in 7
Planned rest, so the other six can run at full speed.

Start with one team and one cycle.

Two weeks is enough to know. If the Monday meeting comes back, nothing is lost: it is all still in the issues.